WORLD● LOWSep 4 · Sep 4, 2026, 1:54 AM
Flyover to cut down travel time by 30 minutes
The Hindu · south asia
With the main viaduct 2.53 kilometres long and 16.61 metres wide with four lanes, the structure takes off from Nalgonda Crossroads, flies over the Chanchalguda, Saidabad and IS Sadan junctions, to land at Champapet
GlobeAlert aggregates and classifies open sources; the story above belongs to its publisher. Summaries are machine-generated from the source text.
More in World
WORLD22m agoAnalysing female labour of the North East States and Union territoriesThe HinduWORLD29m agoGraduation day held at engineering college in RanipetThe HinduWORLD29m agoTraffic gridlock on Sabarimala route sparks protest as pilgrims are stranded for hoursThe HinduWORLD36m agoSpirit of Hong Kong Awards: medical student draws from experience of volunteer workSouth China Morning Post