GLOBEALERT
WORLD● LOWSep 4 · Sep 4, 2026, 1:54 AM

Flyover to cut down travel time by 30 minutes

The Hindu · south asia

With the main viaduct 2.53 kilometres long and 16.61 metres wide with four lanes, the structure takes off from Nalgonda Crossroads, flies over the Chanchalguda, Saidabad and IS Sadan junctions, to land at Champapet

GlobeAlert aggregates and classifies open sources; the story above belongs to its publisher. Summaries are machine-generated from the source text.

More in World