DISASTER● ELEVATED1h ago · Sep 13, 2026, 4:19 PM
Electricity demand peaks this September, unscheduled power cuts return to Tamil Nadu
The Hindu · south asia
The power demand remained steady in the past few months, at 20,500 MW, as against 16,000 MW-17,000 MW during this time last year. With the shortage of over 3,000 MW, Tamil Nadu Power Distribution Corporation Limited (TNPDCL) has had to purchase 2,000 MW to tide over the crisis
GlobeAlert aggregates and classifies open sources; the story above belongs to its publisher. Summaries are machine-generated from the source text.
More in Disaster
DISASTERBREAKING1h agoOne killed, others feared trapped as hotel building collapses in EnuguPremium TimesDISASTER1h agoOne killed as car crashes into bus stop on Mannuthy–Wadakkancherry highway in KeralamThe HinduDISASTER1h agoFishes, periwinkles, crabs return to Ogoni creeks — FGVanguard NigeriaDISASTERBREAKING2h agoSix killed, 130 missing after Indonesian passenger ship capsizesAl Jazeera [en]